Civil & earthworks
Geomembranes, geotextiles, compaction testing, dewatering.
Most common failureNo weld test record. No record means no weld.
Heavy civil · Marine · Arid land
We quote against your specification, not a catalogue — and we tell you when a number in your drawing won't hold on site.
→Send a drawing, a spec, or a number that doesn't add up.
Inspected, loaded and secured before it ships. Every order.
Drawings, calculations, inspection criteria.
Pre-audit, document chain, gap analysis against the project standard.
Sourcing, factory audit, pre-shipment inspection, logistics, documentation.
Geomembranes, geotextiles, compaction testing, dewatering.
Most common failureNo weld test record. No record means no weld.
Fabricated members, fasteners, cladding and roofing.
Most common failureTolerances accumulate until holes don't line up. No trial assembly, no fit.
Lifting accessories, grillage, load-out systems.
Most common failureLifting points calculated on static load. No dynamic factor.
Straw checkerboard materials, sand barriers, gravity irrigation, pivot systems.
Most common failureRight material, wrong orientation against the prevailing wind.
Configured to site access, ground bearing and transport.
Most common failureDatasheet selection only. The machine gets stuck on arrival.
Wear parts, conveyor components, screening media.
Most common failureRight grade, wrong heat treatment. Half the wear life.
Run from Yiwu, contracted in London. Fifteen years on factory floors across Hebei, Shandong, Jiangsu, Zhejiang, Shanghai, Fujian and Guangdong — we've walked into every plant we source from, and walked out of a few.
Four things we don't do. They're why the rest works.
Response within two working days